
Man-made slate pitched roof replacement
A complete Plymouth roof renewal photographed from the drone during and after installation.
Read more →A selection of our roofing work around Plymouth, including re-roofs, flat roofs, ridge repairs, chimney work and guttering.

Real before, during and after photographs from our projects — no stock roof imagery.

A complete Plymouth roof renewal photographed from the drone during and after installation.
Read more →
From exposed deck and new OSB to felt waterproofing and a finished usable surface.
Read more →
Boarding, laying felt and the final dark felt roof surface.
Read more →Three recent jobs showing the roof before, during and after the work.

Old roof stripped, breathable membrane and battens installed, then finished with slate detailing.
View case study →
Flat roof prepared and finished with a torch-on felt system.
View case study →
Roof stripped, new membrane and battens fitted, tiles reinstated and the ridge mechanically fixed.
View case study →Our own photos from a recent job, including the parts of the roof that disappear once the tiles go back on.

Old covering and roof materials removed in stages.

Breathable membrane fitted across the prepared roof.

Treated battens installed before the tiles were reinstated.

Finished ridge mechanically fixed after the roof covering went back on.
A few photos from recent dry ridge and chimney repairs.

Existing ridge line before the tiles were lifted and the dry ridge work started.

Ridge tiles removed and the ridge line prepared for the new fixing system.

Dry ridge roll positioned before the ridge tiles were mechanically secured.

Existing ridge tiles refitted and mechanically secured to complete the dry ridge system.

Weathered and cracked mortar around the chimney pots before repair.

Fresh flaunching formed around the existing chimney pots for improved weathering.
More photos from our own jobs, including the parts that are normally covered once the roof is finished.

Membrane and battens before the tiles or slates go back on.

Leadwork and chimney details being repaired.

Dry ridge fitted and the ridge tiles mechanically secured.

Guttering and roofline work after fitting.

Replacement slates blended into an existing roof section.

Decking ready before the felt system was laid.
A finished roof only shows part of the job. Membrane, battens, timber, leadwork, ridges, verges and flat-roof edges all need to be right underneath as well.
We replace or repair failed materials included in the job before the roof covering goes back on.
Ridges, valleys, verges, leadwork and roof edges are checked and finished as part of the agreed work.
Once finished, the roof and surrounding work area are checked and our waste is cleared away.
Call us or send a few photos with your postcode.